Key facts
Client: Wessex Water
Location: River Brit
Problem: 4” main with a high leakage rate of 4m³ /hr in a logistically challenged location under the river.
Objectives
Minimal network downtime
Minimise disruption to surrounding environment and community
Two technicians attended the site to operate the Origin No Dig® system. Within 2 hours the product was injected via the neighboring hydrant. The leak was repaired and the pipe was flushed, restoring normal service.