NWL AQUEDUCT REPAIR

NWL AQUEDUCT REPAIR

NWL AQUEDUCT REPAIR

Key Facts

  • Client – Northumbrian Water

  • Location – Nine Wells Aqueduct

  • Problem – Historic ongoing leakage reducing supply to treatment plant

Objectives

  • Survey aqueduct

  • Identify problematic sections of the aqueduct

  • Assess nature of repairs required

  • Minimal disruption to the network

Solution

During a 2 week working period, across 300m section of the aqueduct, 2 Origin Technician’s identified and repaired 80 leaks and joint failures using Origin No Dig® product under live conditions. This work was carried out through a period of drought, therefore it was imperative to not restrict water supply.